The following roadworks are being carried out within the BCP Council area by the council and various utility companies this week:
1. Arrowsmith Road (Poole) - outside Appledore
Temporary traffic signals on 7 July until 15 July during SWW installation works.
2. Ashley Road - outside 16/18 to opposite 18
Temporary traffic signals on 8 July until 10 July during CityFibre installation works.
3. Bath Road - Bath Hill Court
Temporary traffic signals on 10 July during Wessex Water works to repair a damaged manhole cover.
4. Benellen Road – junction with Glenferness Avenue
Temporary road closure on 13 July until 31 July during BCP excavation to repair a damaged sewer. Signed diversion route in operation.
5. Brownsea View Avenue (Poole) – outside 30
Temporary road closure on 8 July until 12 July during Wessex Water works to repair damaged sewer.
6. Brudenell Avenue (Poole) – junction with Shore Road
Various carriageway restrictions (including a small road closure) on 1 April until 30 August 24 during SGN installation and maintenance works. Signed diversion route in operation.
7. Clifton Road – junction with Southbourne Overcliff Drive
Temporary road closure on 28 May until 12 July during SGN installation works. Signed diversion route in operation.
8. Coles Avenue (Poole) - outside Dorset House
Temporary traffic signals on 8 July until 19 July during SGN installation works.
9. Durley Road – junction with Hahnemann Road
Temporary road closure on 8 July until 19 July during BCP junction remodelling works Signed diversion route in operation.
10. Elgin Road - outside 2
Temporary road closure on 8 July until 12 July during SSEPD maintenance and installation works. Signed diversion route in operation.
11. Elms Avenue (Poole) - outside 31/33 to outside 44
Temporary traffic signals on 10 July until 16 July during SSEPD maintenance and installation works.
12. Glenferness Avenue – junction with Leven Avenue
Temporary traffic signals on 22 May until 23 July during BCP footpath improvement and installation works.
13. Glenferness Avenue – outside 31
Temporary traffic signals on 8 July until 12 July during SSEPD new connection installation.
14. Glenferness Avenue – junction with Rothesay Rod to Leven Avenue
Temporary road closure on 8 July until 12 July during BCP carriageway resurfacing and lining. Signed diversion route in operation.
15. Holdenhurst Road – jct with Buchanan Avenue to jct Captone Place
Temporary road closure on 24 June until 10 July during BCP resurfacing works. Signed diversion route in operation.
16. Holdenhurst Avenue – junction with Ovington to outside 89
Temporary road closure on 8 July until 26 July during BCP Installation of Zebra Crossing, footway and carriageway resurfacing. Signed diversion route in operation.
17. Kinson Road – outside 230A
Temporary traffic signals on 10 July during BT installation of pole.
18. Lake Road (Poole) – junction with Upwey Avenue to junction with Hoyal Road
Temporary road closure on 5 July until 19 July during SGN works for a new connection.
19. Leven Avenue – junction with Glenferness Avenue
Temporary road closure on 20 May until 23 July during BCP works to construct a raised cycle lane. Signed diversion route in operation.
20. Lorne Park Road – junction with Stafford Road
Temporary road closure on 29 April until 24 July during SWW works to make a new connection. Signed diversion route in operation.
21. Lymington Road (Christchurch) from Bridge to residential properties
Temporary traffic signals on 9 July until 19 July during BCP drainage improvement works.
22. Normandy Way (Poole) – link road between Lake Drive and Normandy Way
Temporary road closure on 15 April until 2 August during SGN installation and maintenance works. Signed diversion route in operation.
23. Oakmead Road (Poole) – outside 1
Temporary traffic signals on 8 July until 16 July during SSEPD installation works.
24. Parkwood Road – junction with Christchurch Road - junction with Darracott Road
Temporary road closure on 8 July until 30 August during SGN installation works. Signed diversion route in operation.
25. Poole Road – outside 42
Temporary traffic signals on 8 July during Wessex Water works to replace a rocking/noisy access cover.
26. Priory Road – outside Trouville Hotel
Temporary traffic signals on 8 July until 10 July during Virgin Media installation works.
27. Poole Road – outside 42
Temporary traffic signals on 8 July during Wessex Water works to replace a rocking/noisy access cover.
28. Purewell (Christchurch) - outside 12 to outside 14
Temporary road closure on 9 July until 11 July during SSEPD maintenance and installation works. Signed diversion route in operation.
29. Queens Park Gardens - junction Queens Park West Drive - junction Comer Road
Temporary road closure on 1 June until 19 July during SGN installation works. Signed diversion route in operation.
30. Ringwood Road (Poole) – junction Parkstone Heights to outside 46
Temporary traffic signals on 13 May until 1 September during SGN installation works.
31. Spur Road (Christchurch) - Lane 1 East and West (but not at the same time)
Temporary (night-time mobile works) carriageway restrictions on 11 July during BCP maintenance.
32. Surrey Road - junction with Queens Road To outside 2
Temporary traffic signals on 3 July until 26 October during SGN works to replace a new gas main.
33. Stafford Road - junction with Lorne Park Road
Temporary road closure on 29 April until 24 July during SWW works to make a new connection. Signed diversion route in operation.
34. Stinsford Road (Poole) – outside 71
Temporary traffic signals on 12 July during Wessex Water works to replace a rocking/noisy access cover.
35. Terrace Road- outside Foxdale Court, 17
Temporary traffic signals on 9 July during Wessex Water works to replace a rocking/noisy access cover.
36. Turbary Park Avenue – junction with Lydford Road to opposite 3
Temporary traffic signals on 3 June until 2 August during SSEPD fault locating, repair and installation works.
37. Wallisdown Road - side of 1 Alton Road
Temporary traffic signals on 11 July during Wessex Water works to replace a rocking/noisy access cover.
38. Walsford Road – junction with Glenferness Road
Temporary (night-time mobile works) carriageway restrictions on 13 July until 2 August during BCP crossing improvements.
39. Wimborne Road - outside 2 Rushton Crescent
Temporary traffic signals on 9 July during Wessex Water works to replace a rocking/noisy access cover.
Comments: Our rules
We want our comments to be a lively and valuable part of our community - a place where readers can debate and engage with the most important local issues. The ability to comment on our stories is a privilege, not a right, however, and that privilege may be withdrawn if it is abused or misused.
Please report any comments that break our rules.
Read the rules hereLast Updated:
Report this comment Cancel